Steel Erection Estimating

Accurate, detailed erection estimates grounded in real field experience. We account for sequencing, crane picks, raising gang, detailing and decking labor, and site-specific conditions that office-only estimators miss.

What's Included

• Steel Erection Takeoffs

• Erection sequence costing

• Site condition analysis

• Bid package review

Who This Is For

• GCs — Protect your schedule and budget

• Owners & Developers — Reduce capital risk before steel hits the site

• Steel Erection Subcontractors — A peer review from someone who's bid the work, run the jobs and set the iron.

• Fabricators — Avoid connection-detail conflicts before fabrication

FAQ

Q: What makes a steel erection estimate different from a general construction estimate? A: A steel erection estimate has to account for crane picks, raising gang labor, erection sequencing, and site-specific access — variables that generic estimating software and office-only estimators typically miss because they haven't actually erected steel in the field.

Q: When should I get an erection estimate reviewed? A: Ideally during bid preparation, before the number goes out the door — catching a sequencing or crane-access gap at the bid stage is far cheaper than discovering it after award.

Q: Why does field experience matter for estimating? A: Someone who has actually run raising gangs and set columns knows where sequencing assumptions break down in practice — a desk-only estimate can look complete on paper and still miss real site constraints that drive cost overruns.